Light Metro Coach Garages and Depots
Work Scope
Detailed Design (including foundations and civil engineering works of all machinery and facilities) and Construction Management
Property: MINTRA
Builder: Rubau-Ortiz Joint Venture
Ending Year: 2006
Technical Data
Steel and prescast concrete structure.
Built area: 19,700 m2.
Forged: Precast concrete girders, hollow-core slabs and two-way ribbed slabs with concrete block.