Metro L-4 Coach Garages and Depots
Work Scope
Detailed Design (including foundations and civil engineering works of all the machinery and facilities) and Construction Management
Property: MINTRA
Builder: Ploder
Ending Year: 2006
Technical Data
Screen-piled containment precast girders and hallow-cored slabs for roofing. Architect: Iberinsa
Built area: 14,000 m2; 10,000 m2 for coach depots and 4,000 m2 for tunnel
Floor slabs: Forged precast concrete girders, hollow-core slabs and reinforced concrete slabs