Mularroya Reservoir Viaduct
Work Scope
Detailed Design and Construction Engineering
Property: Confederación Hidrográfica del Ebro (Ebro Hydrographic Confederation)
Builder: Sacyr-Acciona Joint Venture
Ending Year: 2017
Technical Data
Twin girder composite deck with double composite action - Strict box girder
Overall length: 445 m
Span lengths: 37+6x60+48 m
Width: 11.30 m
Maximum piers height: 42.5 m