Projects

Vigo Airport and IFEVI​ Footbridge

Vigo Airport and IFEVI​ Footbridge

Vigo
Spain
Vigo

Work Scope

Detailed Design and  Construction Management​

Property: Spanish Ministry of Public Works​

Builder: Copasa

Ending Year: 2015

 

Technical Data

Simple-supported steel girder​

Overall length: 280.52 m

Span lengths: 84+28.43+24.48+34.60+2x27.31+40+19.52+34.21+35.42

Width: 2.97 m